Concept of SAP SCM PP/DS
Filed under: Production Planning and Detailed Scheduling, SAP Advanced Planning and Optimization, SAP SCM
PP planning methods control the planning actions that the SAP system performs when an event relevant to planning occurs for a specific product in the SAP SCM or OLTP systems. The system can automatically plan the product in the case of a change in requirements or create a planning file entry for the product for example.
.
…Click here to read more
Viewed 613 times by 169 viewers
Horizons in PP/DS
Filed under: Production Planning and Detailed Scheduling, SAP Advanced Planning and Optimization, SAP SCM
Production Planning (PP) and Detailed Scheduling (DS) are not only related in terms of business but also in terms of time. Outside the PP/DS horizon, both areas can initially be delineated in the short-term horizon, in contrast to medium to long-term planning methods like SNP.
Within the PP/DS horizon, the key focus of Production Planning (PP) is lot-size-orientated planning in the sense of quantity-orientated requirements planning. Its actual viability/feasibility is only decided when capacities are dispatched (DS) within a short-term time frame (in which production also normally takes place).
In many cases, this is typically well above the planning time fence. The planning time fence can distinguish the quality planning responsibility area (MRP functionality) from the actual detailed scheduling as internal elements cannot be changed from the requirements planning run whereas, by contrast, detailed planning with respect to deadlines is still possible.
Viewed 2025 times by 445 viewers
ATP – Availability Checking in SAP
ATP is simply “Available To Promise” quantity which we can promise to the current object. Object may be a sales order/delivery or production order. Here is simple steps to understand the availability checking in SAP system and a general guide lines to availability check.
Availability check is carried out in different transactions like Sales order creation, delivery creation, Purchase order creation, goods issue and also in production order.The point to be noted here is every where the availability check is carried out using two basic elements.
- Checking rule
- Checking group
Viewed 2412 times by 515 viewers
Overview of Production Planning and Detailed Scheduling
Filed under: Production Planning and Detailed Scheduling, SAP Advanced Planning and Optimization, SAP SCM
Production Planning and Detailed Scheduling
Procurement in a location (if necessary, at all BOM levels) is planned using Production Planning and Detailed Scheduling. Planning can be consumption-based (by specifying a reorder point, for example) or plan-based.
If a material is planned using MRP, procurement is based on future independent requirements; and if procurement takes the form of multilevel in-house production, timely procurement of assemblies and components is also planned.
.
Detailed (short-term) procurement planning in a location therefore takes place within Production Planning and Detailed Scheduling. It contains two fundamental steps: Material requirements planning (MRP) and also capacity requirements planning, which, in contrast to planning in SAP ECC system, can be executed simultaneously.
Viewed 2866 times by 587 viewers
Evaluations in SAP SCM for DP and SNP
Filed under: Production Planning, SAP Advanced Planning and Optimization, SAP BW, SAP SCM
The SAP SCM planning data can be evaluated directly using BW tools. These tools not only evaluate InfoCubes in the internal BW system but also transaction data directly from the liveCache.
To use liveCache reporting, you require a planning area in SAP SCM, an extract structure for the planning area, and InfoSource and an SAP RemoteCube, which provides the interface to the BW front end.
.
Using the BW Business Explorer in SAP SCM system, you can evaluate:
• Order data from the SAP liveCache
• Aggregated data in InfoCubes
Viewed 3072 times by 609 viewers















